Greenwood Academy/Commercial Solar Design & Install 2025 (Melbourne)

Live Training. Real Site Impact.

Grab a seat to Victoria's sole, live SAA Accredited Commercial Solar training. Held at Greenwood HQ in Collingwood, this immersive full day training will give you the confidence to learn all process steps involved in large scale commercial PV installs.

  • $570 or 3 monthly payments of $190

Commercial Solar Design & Install 2025 (Melbourne)

  • 0 left
  • Coaching session

The all-day “Commercial Solar Design & Install” course will provide you with invaluable insights and practical knowledge. This is your chance to kick-off, jump-start or propel your career in the renewable energy industry.

DATE: 13th August 2025

LOCATION: 212-218 Johnston St Collingwood VIC 3067

RUN TIME: Course starts at 8:00 am and finishes 4 - 4:30

BREAKS: 40 min lunch, 15 min afternoon tea

CPD POINTS: 60

Join our multiple presenters

Hosted by 20-year industry veteran and Academy's Lead Educator Veli Markovic (SAA Accredited ON / OFF Grid) & Jayesh Satani, GridSafe Product Manager MEM / B.ENG / SAA Accredited Designer.

This action packed day offers real world experience in the field that no one else teaches. Right here in our boardroom.

22 Modules covered across all aspects of Commercial Solar.

What Greenwood has learnt in 10 years the hard way, we pass on to you.

Future - proof your business

The commercial solar industry is evolving fast - with new tech, shifting regs and increasing competition.

Master the latest technology, navigate complex commercial installs through real project examples.

Gain skills to quote, design and deliver projects with precision - help reduce risk to your business, by hearing first hand from Greenwood.

What you'll learn in detail:

Preliminary Costings Breakdown

Create an early-stage estimate of the total project cost, based on initial site data, proposed system size, and component selection.

It’s essentially a ballpark financial snapshot to help stakeholders gauge interest.

Commercial Solar Process

The end-to-end workflow of designing, approving, and installing a solar energy system for a business or industrial site.

Think of it as the blueprint from concept to kilowatt and everything that goes on in between.

Site Visit

On-location inspection to gather critical data for designing a solar system, such as roof condition, shading, switchboard layout, and structural integrity.

It’s the boots-on-the-ground step that turns assumptions into facts, ensuring the system design is accurate, compliant, and install-ready.

Formal Proposal

The detailed client-facing document that outlines your final solar system design, costs, expected performance, warranties, and terms of agreement.

It’s the polished pitch that turns technical plans into a professional offer, ready for client sign-off and project green light.

Project Management

Project management in solar involves coordinating all phases of the installation—from procurement and scheduling to compliance, logistics, and communication.

This ensures the system is delivered on time and within budget. It’s the behind-the-scenes engine keeping the whole show running smoothly, on time and on budget.

Documentation

The collection and organisation of all required technical, regulatory, and project-related paperwork—like engineering designs, compliance forms, connection applications, and warranties.

It’s the paper trail that keeps your project traceable and ready for future servicing.

The Grid Application Steps

A step by step guide on pre - approvals through to engineering sign off and post install connection and DNSP approvals.

Without these steps being adhered to, you risk your new PV system not being accepted by the distributor.

-Or worse.

A solar system that cant be switched on.

Detailed Engineering Design

The technical blueprint of your solar system, translating the concept into actionable construction plans with precision.

It includes electrical schematics, layout drawings, structural calculations, protection settings, and compliance docs.

Everything needed to build the system right the first time.

The Inverter Equipment Selection

The brain of any solar system—it converts DC electricity from the panels into AC power that can be used onsite or exported to the grid.

Beyond conversion, it manages grid compliance, system monitoring, safety shutdowns, and sometimes even battery integration or export control - a critical choice for install.

Solar Panel and Rail Equipment

Solar panels convert sunlight into DC electricity, and their efficiency, durability, and warranty directly impact system performance and ROI.

Rails and mounting equipment form the structural backbone, securing panels to rooftops in all weather conditions.

Interface Protection Board

The safety device installed between the solar system and the grid.

Typically required for larger commercial systems. It provides extra layers of protection—like overvoltage, overcurrent, anti-islanding, and network monitoring—to ensure the system disconnects safely.

Secondary Injection Testing

Learn about the commissioning process used to verify that the protection relays respond correctly to simulated fault conditions.

It ensures the system trips precisely as required by grid standards - making it a critical final step before grid connection on larger systems.

Ed Bennison

Principal Engineer (MIEAust) | Arigo Consulting

"Greenwood Academy’s courses cater from entry level to high end engineering. 10 Years of experience in an ever growing industry is captured perfectly in relevant course content."

Ryan Butcher

North Electrical

"I've been a Sparky for 15 years with no major focus on solar or batteries. Doing the courses has given me huge confidence to price up jobs and we are winning more work as a result."

Dean Lucas

DRL Electrical

"Straight to the point training. Relatable course content that is genuine. Learning a lot and I'm only half way through the list."

Course Content:

Exclusive Live Training is SAA ( Solar Accreditation Australia) accredited.

Commercial solar process

  • Hidden costs labour and materials

  • Understanding whats involved from a commercial solar perspective:

    • Network Application Costs

    • Grid Protection Costs

    • Testing of Grid protection Costs

    • Roof structural engineering costs

    • Cost of materials

    • Cost of labour

Grid Application

  • DNSP requirements

    • What it is

    • What are the cost implications

    • What is needed documentation wise

    • Importance of attention to details

Secondary protection board

  • DNSP requirements:

    • Difference between Primary and Secondary protection

    • Where and when it applies

    • What settings are looked at

    • What does the relay do

Secondary Injection Testing

  • DNSP requirements:

    • What it does

    • What's its purpose

    • Who requires it

    • What does it cost

Preliminary Costing

  • Initial scope:

    • What is its role

    • The importance of the preliminary costing

    • What it looks like

    • What should and shouldn't be included

    • Bill analysis

    • Authority to act

    • Design based on financials

Site visit

  • Data:

    • The site vist aim

    • Organising where, whem and whom

    • General information collected

    • Detailed electrical information collected

    • Time spent based on project complexity

Formal Proposal

  • Decider:

    • Want to include about your company

    • Focus on your strengths

    • Other sevices offered

    • Site and project scope

    • How to present the data

    • Guarantees, logistics and contract

Project management

  • How, why and when:

    • What it is

    • RACI

    • Importance of PM

    • What and who gets managed

    • Documentation

    • Site equipment

    • Task responsibility

The equipment

  • Inverters:

    • Inverters Selection criteria

    • CEC list approval

    • Design flexibility

    • Production loss comparisons

    • Reputation, warranty and technical help

  • Solar panels:

    • Selection criteria

    • CEC list approval

    • Design flexibility

    • Panel degradation, efficiency, pricing

    • Reputation, warranty and technical help

    • Installation material costs ratios

    • Payback

  • Rail:

    • General and structural

    • What standards apply

    • Basic roof structural concepts

    • Penetrative verus non

The Design

  • Inverters:

    • Inverter Number of inverters and inputs

    • DC cable selection

    • Current carrying capacity and heat dissipation

    • Inverter table

    • DC voltage drop

    • Importance and referenced standards for DC voltage drop

    • Actual cable runs and how to calculate

    • The calculations

  • DC, Earth and tray:

    • DC and Earth cable and cable tray

    • Limitations of the standards when looking at 1500V 120degree rated Dc cable

    • Should and shall

    • Parallelling versus single strings

    • Cost comparison between DC sting options

    • Earthing and material costs

    • Cable tray costing comparison

    • Option comparison

  • AC protection:

    • Inverter circuit breakers

    • Calculating inverter current

    • The 1.25 rule

    • Breaker sizing and derating

  • AC main protection:

    • Main Breaker

    • Calculating the cummulative current

    • Sizing the main breaker do's and don'ts

    • What sized breakers are available, MOCB

  • Inverter station:

    • Inverter station

    • Where can they go

    • Spacing requirements

    • Example diagram

    • How far away from the DB or MSB

    • Cable tray requirements

  • Run number one - CCC and tray:

    • Inverter to GridSafe -CCC and Cable tray

    • Correct AC cable selection

    • Advantages of high temp cable

    • Using AS3008 to determine CCC

    • Understanding the derating tables

    • Looking at differences in CCC due to cable tray covers

    • Heat dissipation and its effects on CCC

  • Run number one - Vrise:

    • Inverters to GridSafe - Vrise

    • Apps that do it for you

    • Calculations based on the impedance method

    • Which inverter to base the calculation

    • Resistance, reactance, impedance

    • How to calculate accurately

    • Importance of conductor temperature

  • Run number two - complete:

    • GridSafe to MSB

    • Step by step approach

    • Relevant tables in AS3008

    • CB protection and Cable rating relationship

    • Multi or SDI selection

    • Cable routing, cable tray design

    • Single cables or parallel configuration

    • Working with cable, flexibility

    • Vrise calculations

  • Run number three - complete:

    • MSB to POS

    • Measuring this run

    • What is the overall correct Vrise calculation sequence

    • What can and can'r adjust

Documentation

  • Onsite and other:

    • What documentation is needed

    • Importance of having the right working drawings

    • DNSP paperwork, commissioning and other

    • Spreadsheet approach to documentaion control

    • Why is it needed

    • Importance of customer documentation